We Just Signed Off on a New Corrugated Insert Design. Here's What the Testing Process Actually Looked Like.
By Emily Zhang · Quality Control Manager, KAKA PACKAGING
Last month, Kevin from our engineering team brought me a new corrugated insert design he'd been developing for a client who ships glass components in custom corrugated boxes. The client had been using foam inserts sourced separately, which were adding cost per unit and creating disposal issues on the receiving end. Kevin's proposal was a fully corrugated insert — same material as the outer box — that would hold the glass components in position through shipping without requiring any secondary foam or loose fill.
My job at that point was to put that insert design through its paces before we committed to production. A new insert design that looks good on paper and prototypes well on a bench doesn't always perform the way you expect when it's loaded with real product and exposed to real transit conditions. Finding that out during testing is the whole point.
Dimensional Verification First
Before any performance testing, I verify that the physical prototype matches the design specification. Corrugated inserts for custom corrugated boxes have tighter dimensional tolerances than the outer box itself, because they're designed to hold a product in a specific position — a few millimeters of variance in an insert can mean the product has more movement than the design intended, which undermines the whole protective purpose.
Kevin's first prototype was within tolerance on all dimensions, which was a good start. I also checked the corrugation direction relative to the load-bearing orientation of the insert — this matters because the fluted structure of corrugated board resists compression most effectively in one direction, and an insert that's oriented incorrectly relative to the load it's carrying won't perform to its rated strength.
Everything checked out on the first prototype. That's not always the case — we've had insert designs come through where the die dimensions needed a small adjustment, or where the score lines needed to be repositioned for cleaner folding. Getting those details right in the prototype stage is exactly what prevents problems in production.
Load Testing the Insert
With dimensional verification complete, I moved to performance testing. For a corrugated insert designed to protect glass components in custom corrugated boxes, the relevant tests are vibration resistance, drop performance, and static compression under stacking loads.
For drop testing, I load the custom corrugated box with the insert and the actual client product — not a simulation weight, but real glass components — and drop it from standardized heights onto different surfaces and orientations. Drop onto the corner. Drop onto the face. Drop onto the edge. Each orientation stresses the insert differently, and each one is a failure mode that happens in real shipping environments.
The first round of drop tests on Kevin's new insert design showed one issue: drops onto the bottom corner were producing slight lateral movement in the heaviest component. The insert was holding under direct face drops, but the corner drop created a rotational stress that the current cell geometry wasn't fully managing. I documented this, marked the specific failure mode, and took it back to Kevin with the physical samples showing the deformation pattern.
Iteration and Sign-Off
Kevin modified the cell geometry on the insert to add a secondary retention feature at the base of the heaviest component's cell. The revision took a couple of days. He brought me the updated prototype, and I ran the drop sequence again — same heights, same orientations, same product load.
The revised insert held on every drop. I ran twelve units through the test sequence rather than the standard six, because I wanted confidence that the improvement was consistent across the batch rather than a function of a single well-folded prototype. All twelve passed.
I signed off on the design for production. My sign-off on a new corrugated insert design means I'm confirming that the prototype has passed dimensional verification, orientation checks, and physical performance testing under conditions that represent real shipping stress. It doesn't mean the insert is perfect — nothing manufactured is — but it means it's been tested rigorously and the failure modes we could identify have been addressed.
What This Process Means for Clients
The testing cycle for a new corrugated insert design at KAKA PACKAGING typically adds a week or two to the overall custom corrugated box project timeline. Clients who are in a hurry sometimes push back on that. My answer is always the same: the testing time is substantially shorter than the time it takes to handle a damage claim, investigate a packaging failure, and reorder custom corrugated boxes in a redesigned specification.
Getting the insert right before production means the client receives custom corrugated boxes that protect their product the way the design is supposed to. Getting it wrong means a production run that doesn't perform — and a much longer, more expensive resolution process.
If you're shipping a product that currently relies on foam or loose fill for protection inside a corrugated box, a custom corrugated insert might be worth exploring. It's not the right solution for every application, but for the right product, it simplifies packing, reduces material cost per unit, and produces a more consistent result than fill materials do. Talk to KAKA PACKAGING and we'll give you an honest assessment of whether it makes sense for your product.
Mailer Boxes
Econoflex Mailer Boxes
Shipping Boxes
Regular Shipping Boxes(RSC)
Product Boxes
Paper Bags
Kraft Paper Bags